The process starts with a site survey and utility locate. The installer measures the available footprint against the 34 ft x 64 ft play area plus run-off, checks the existing surface or soil, identifies drainage paths, and flags any tree roots or grade changes that will affect the base. In Atlanta, red clay soil and uneven lots are common, catching those conditions at this stage prevents costly corrections later. Once the site is understood, excavation and grading bring the sub-base to the correct level and slope, typically a 1 percent cross-slope to shed water away from the court surface.
Base construction is where the long-term performance of the court is decided. Concrete and asphalt are both viable options, and the right choice depends on your site conditions, budget, and intended use. Concrete is rigid and resists surface movement, but requires control joints and careful curing. Asphalt is more flexible and generally faster to install, but needs a well-compacted sub-base to prevent rutting. Both options are priced separately in your written proposal so you can compare them directly. Once the base is cured, acrylic colour coating is applied in multiple passes by squeegee, coating thickness and UV resistance matter in Atlanta’s warm, humid climate, where surface wear accelerates faster than in cooler regions.
The final phase covers line marking, net and post installation, and optional accessories. Regulation striping includes the non-volley zone, service boxes, centerline, and baselines, all applied to the cured acrylic surface. Net posts are anchored in concrete footings at the correct center-court position. Perimeter fencing uses galvanized steel posts set in concrete footings with chain link mesh stretched to tension, and gate hardware fitted for single or double access. LED court lighting, where included, covers pole foundations, underground conduit, fixture mounting, and a post-install light level check across the full court surface. The installer walks the finished court with you before sign-off so you can confirm every element before the project closes.